AMC 10 · 2024 · #2
Grade 8 algebrarate-ratio linear-equations-two-varsystems-of-equationsrateformula-substitution convert-to-algebraidentify-subproblems ↑ Prerequisites: linear-equations-one-varmulti-digit-arithmetic
📏 Short solution 💡 2 insights
Problem
A model used to estimate the time it will take to hike to the top of the mountain on a trail is of the form where and are constants, is the time in minutes, is the length of the trail in miles, and is the altitude gain in feet. The model estimates that it will take minutes to hike to the top if a trail is miles long and ascends feet, as well as if a trail is miles long and ascends feet. How many minutes does the model estimates it will take to hike to the top if the trail is miles long and ascends feet?
Pick an answer.
(A)
240
(B)
246
(C)
252
(D)
258
(E)
264
AMC 10 2024 problem © Mathematical Association of America (MAA AMC). Reproduced for educational use.
Try it yourself first — the explanation is most useful after you’ve attempted it.